메뉴 바로가기
주메뉴 바로가기
컨텐츠 바로가기

Geotechnics & Tunnel Engineering

BUSINESS

Starting basic & detailed design service for road bed construction of Metropolitan high speed railway, Seohyun has conducted successfully a lot of basic & detailed designs, turn-key projects involved in construction fields of long tunnel at more than 2000m in length, large scale temporary structure near tall buildings, improvement of soft ground. Seohyun will try to do the best to take the competitive edge of geotechnical engineering through accumulated technology and a variety of design experience.